We are actively expanding a diversified portfolio across Argentina’s key energy corridors.

An Integrated Energy Platform

Edenor is Argentina’s largest electricity distributor

0
Year Concession (to 2087)
0 M

Customers

0 %

Mkt Share

0 M

Users

+ 0 K

GWh

Energy sales (2024)
0

Year Concession (to 2087)

0 M

Customers

0 %

Mkt Share

0 M

Users

+ 0 K

GWh

Energy sales (2024)

Edemsa is the largest electricity distributor in the Province of Mendoza

0
Year Concession (to 2048)
+ 0 k

Customers

+ 0

GWh

Energy sales
(2024)

0 M

Users

0 %
Market in Mendoza
0

Year Concession (to 2048)

+ 0 k

Customers

0 %
Market in Mendoza
0 M

Users

+ 0

GWh

Energy sales (2024)

Strategic asset located in the Province of Chubut covering both electricity generation at the dam as well as river flow and flood control, up and down stream

0 MW
Installed Capacity
0

Kmw

Estimated Basin Area
+ 0 k

MWh

Avergae annual energy generated
0

MW/sec

Average Annual River Flow
0

MW

Installed Capacity
0

Kmw

Estimated Basin Area
+ 0 K

MWh

Avergae annual energy generated
0

MW/sec

Average Annual River Flow

Solar Park Capiz I & II

Capiz I & II are located in San Carlos, Mendoza Province, on flat terrain with access to a major paved road and grid interconnection. 

The site lies within Edemsa’s service area, with the project registered in the MEM (Wholesale Electricity Market). Its production will be supplied to regulated users within this coverage area.

0 MW
Installed Capacity

Expected

COD

November 2026
+ 0 K

MW/h

Annual generation
0

USD M

Required Investment
+ 0 k Tn
avoided CO2 emissions
0 MW
Installed Capacity

Expected

COD

Nomvember 2026

+ 0 K

MW/h

Annual generation

0

USD M

Required Investment
+ 0 K Tn
avoided CO2 emissions

Solar Park Uspallata

The Uspallata solar plant will be located in Uspallata, Las Heras, Mendoza, in a high-altitude region with the strategic goal of reducing fossil-fuel generation in an area that is traditionally difficult to serve. 

The site lies within Edemsa’s service area and the project is registered in Argentina’s Wholesale Electricity Market (MEM). Its production will be dispatched to CAMMESA, the system operator, for distribution to end users within the regulated market.

0 MW
Installed Capacity

Expected

COD

May 2026

+ 0 K

MW/h

Annual generation
0

USD M

Required Investment
+ 0 k Tn
avoided CO2 emissions
0 MW
Installed Capacity

Expected

COD

May 2026

+ 0 K

MW/h

Annual generation

0

USD M

Required Investment
+ 0 K Tn
avoided CO2 emissions

Solar Park Green City

The Green City Solar Project is located in the Province of Buenos Aires and will be the largest solar park in the Province. The project is registered in the MEM (Wholesale Electricity Market) and its production will be supplied to regulated users within the coverage area.

0 MW
Installed Capacity

Expected

COD

April 2026

+ 0 K

MW/h

Annual generation
0

USD M

Required Investment (RIGI elligible)
+ 0 k Tn
avoided CO2 emissions
0 MW
Installed Capacity

Expected

COD

April 2026

+ 0 K

MW/h

Annual generation

0

USD M

Required Investment
+ 0 K Tn
avoided CO2 emissions

Expansion into high growth verticals across the energy value chain powered by our generation and distiribution assets

Storage

Maximize the value of our solar parks in Buenos Aires and Mendoza. 

Become a supplier of storage capacity to distribution grids (i.e. 500 MW tender in Buenos Aires Province).

Critical Minerals

Secure access to critical mineral supply for our operation. 

Strengthen market positioning by following the strategic path of leading energy companies in Argentina.

Data Centers

Establish early leadership in Argentina’s data center market by leveraging our network infrastructure.